The new plant put into operation before pickling passivation

Most favorable price : sales@hellerbearings.com

We can provide free samples . Please contact Email for any inquiries

Requirements pickling passivation stainless steel equipment and pipeline put into operation before the start of many large-scale chemical industry, chemical fiber, fertilizer and other devices. Although the device has been carried out in the factory pickling, removing welding slag, oxide, but the process of storage, transportation, installation and inevitably caused by grease, sediment, rust and other pollution, to ensure that devices and equipment commissioning products (especially quality to meet the requirements of chemical intermediates and refined products), to ensure a successful test must pickling passivation. Such as H2O2 production device stainless steel equipment and piping, before going into production must be cleaned, otherwise if dirt heavy metal ions lead to catalyst poisoning. In addition, if the metal surface grease and free iron ions cause the decomposition of H2O2, violent release a lot of heat caused by the fire or even an explosion. The same oxygen pipeline for the presence of traces of oil pollution and metal particles may produce sparks serious consequences.

234407BM 234706BM 234406BM 517/2860V/YA 5610/2500 517/1720X1V 527/1181M 510/1180M 517/930 510/670 590/560 510/500 52780 59080 517/368M 51760U 517/238 6207-2ZN 6206-2ZN 6205-2ZN 6204-2ZN 6203-RZ 6203-2ZN 6202N 6202-2ZN 6201-2ZN 6200ZZ 6200-2ZN 62/32-ZN 62/32-Z 62/32N 62/32-2Z 62/32-2RZ 62/32-2RS 62/28-2RZ 62/22-2RZ 61996 61992 61988 61984

Introduction

Portfolio Image
Portfolio Image
Portfolio Image
Portfolio Image
Portfolio Image
Top